MATERIAL PROCESSING

Value and Sustainable Engineering Solutions

demolition2.JPG

FORMER POWERGEN SITE, SHIRLEY. £1.25M

Material processing

This project required demolition, remediation and infrastructure of the former Powergen high rise buildings and multi-story car park for future redevelopment of this town centre site. The works comprised of arrangements with the appropriate authorities for disconnection of services and removal of fittings and equipment of previous owners. We began with the internal strip out and recycling of all segregated waste, timber, glass, plastic and plasterboard. Followed by the asbestos removal including licenced Notifiable asbestos. The project team then prepared the road closure, to enable the demolition of the 4 and 8 story buildings, to be taken back from the existing dual carriageway at the site boundary. Further road closures and night working continued on other areas of this scheme to mitigate traffic issues. The four structures within the site boundary were demolished including foundations. Contaminated hotspots were removed and bio remediated before placing at depth on site.

matprocessing-1.jpg

HIGH RISE BUILDING AND MULTI-STORY CAR PARK DEMOLITION

Live town centre environment

All concrete and brickwork has been recycled into materials for reuse on site as 6N structural backfills to basements and voids, with the reminder reused on site in the new roads and sewers. The site was remodelled in preparation for a new build following completion of the drainage and road infrastructure.

bottom of page